None M8WR Manuel d'instructions

Naviguer en ligne ou télécharger Manuel d'instructions pour Non None M8WR. none M8WR Instructions / Assembly Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
030099-177 Rev B Page 1 of 2
OASIS CORPORATION
265 N. Hamilton Road 6 P.O. Box 13150
Columbus, Ohio 43213-0150 U.S.A.
1.800.64.OASIS (1.800.646.2747)
www.OasisWaterCoolers.com
OASIS
®
MODULAR FOUNTAINS AND WATER COOLERS
INSTRUCTIONS
1.
INSPECTION --
Inspect the cartons and various components for evidence of rough
handling and concealed damage. Damage claims should be filed with the carrier.
2.
MAINTENANCE
(Fountains with Cooling Unit) -- The only maintenance required is the
removal of dirt and lint from the condenser. Inspection should be made at 3-month
intervals. Remove the grille and clean the condenser with a vacuum attachment.
3.
OVERLOAD PROTECTION
(Fountains with Cooling Unit) -- The compressor motor is
equipped with an automatic reset protector which will disconnect the motor from the line in
case of overload.
4.
LUBRICATION
(Fountains with Cooling Unit) -- This unit is equipped with a hermetically
sealed compressor, no additional lubrication is required. The fan motor installed on this
unit seldom needs oiling; if required, a few drops of SAE 10 oil should be used.
5.
TO DISCONTINUE USE OF FOUNTAINS WITH COOLING UNITS --
Drain cooler when
removed from service.
a. Remove grille
b. Close supply valve
c. Provide container to catch water, and remove drain plug
d. Remove bubbler.
6.
INSTALLATION, PLUMBING & ELECTRICAL CONNECTIONS --
Plumbing and electrical
(if required) rough-in and wall opening should be prepared as shown on Roughing-in
drawing. (On new plumbing installation, a strainer, not furnished, is recommended.)
a. Insert frame or frames into wall opening and secure to studs.
b.
N
OTE
:
FRONT FLANGE OF FRAME
(
S
)
MUST BE FLUSH WITH THE FINISHED WALL LINE SURFACE
.
c. Attach cradle mounting angles to frame flange with 4 screws provided. Slide unit
mounting cradle into frame and secure in place with 4 screws provided. (Cradle is used
only when cooling unit is to be installed.) NOTE: Bottom flange on cradle is to be behind
frame front flange.
d. Slide cooling unit onto cradle.
e. It is recommended that flexible conduit be used to supply power to the cooling unit and
fountain(s) when required. Check the electric current available. Type and voltage must
be the same as listed on the unit data plate.
f. Place the upper panel in place on the frame top angle and fasten with 2 screws, provided,
at bottom.
g. Use two 1/4" bolts and partially screw into the two holes located in the center of the
pattern of six holes.
h. Place fountain so the two keyholes in the rear are over the two bolts. This should support
the fountain. Using remaining four 1/4" bolts, fasten fountain securely in place. Then
tighten the two bolts used to support the fountain.
Vue de la page 0
1 2

Résumé du contenu

Page 1 - OASIS CORPORATION

030099-177 Rev B Page 1 of 2OASIS CORPORATION265 N. Hamilton Road 6 P.O. Box 13150Columbus, Ohio 43213-0150 U.S.A.1.800.64.OASIS (1.800.646.2747)www.O

Page 2 - 030099-177 Rev B Page 2 of 2

030099-177 Rev B Page 2 of 2i. Complete plumbing to fountain. Check for leaks on new plumbing installations, run waterthrough the bubbler(s) until w

Commentaires sur ces manuels

Pas de commentaire